Green Engineering completed the installation and commissioning works of the engineering systems at the new office of the Swedish cosmetics company Oriflame Cosmetics.
Green Engineering completed a series of contracts with a French cosmetics company Clarins to perform the dismantling and project works on the company’s site with the total area of 650m2
Green Engineering has performed the complex of installation works of the ventilation and air-conditioning system on the company’s site located on Silikatny passage, Moscow.
Repairing works of the existing ventilation and air-conditioning system on the site located on Biryulevskaya str., Moscow.
Green Engineering has performed the design and installation works of the HVAC systems, hot water supply and cold water supply systems for the "C-toys" company
Green Engineering has successfully performed the design and installation works of the HVAC systems, plumbing and sewerage systems mounting in the business center "Noyev Kovtcheg" for "RENOVA-Stroy Group"
Green Engineering has performed the design and installation works of the HVAC systems for the "Detsky mir - Center" public corporation on Temeryazevskaya str, Moscow.
Green Engineering has performed the design works of the engineering systems for the “Bank Uralsib” public corporation on Podkopaevsky pereulok, Moscow.
Installation of ventilation system in the office of OSN-complect company on Kutuzovsky prosp.
salesdesk@mail.ru
© 2006 - 2010 Green Engineering.